Type:
Enhancement
-
Status: Production Complete
-
Priority:
Medium
-
Resolution: Bug Fixed
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: OnBoard
-
Labels:None
-
Module:OnBoard
-
Reported by:Support
-
Company:MATT Construction
-
Item State:LB QA - On Hold
-
Issue Importance:Q1
-
Sprint:NF Sprint 5
- blocks
-
NF-532 Issues with 'E-Verify Case Status' report.
-
- Rejected
-
- is caused by
-
NF-757 Incorrect Issuing Authority code sending to E-verify
-
- Rejected
-
-
NF-1072 Case 1: The No Show Case
-
- Rejected
-
-
NF-1073 Case 4: The Naturalized Citizen Case - Block
-
- Rejected
-
-
NF-1074 Case 8: The COI Case - Block
-
- Closed
-
-
NF-1075 Case 7: The Two ReVerify Case Not complete tested - Block
-
- Rejected
-
-
NF-1325 Case 2: The Queuing Case
-
- Rejected
-
-
NF-1326 Case 3: The Passport Case
-
- Rejected
-
-
NF-1327 Case 6: The Second Step Case
-
- Rejected
-
- relates to
-
NF-741 I-9 Approval Status >> Dropdown control going out of Close Case popup.
-
- Rejected
-
-
NF-749 I-9 Approval Status >> Status Incomplete is not getting changed to DHS Tentative Non confirmation / SSA TNC
-
- Rejected
-
-
NF-751 I-9 Approval Status >> Issues observed in TNC Process popup
-
- Rejected
-
-
NF-758 I-9 Approval Status >> Action button has incorrect graphics.
-
- Closed
-
-
NF-914 I-9 Approval Status >> Error 'Hire Date is required' displayed
-
- Rejected
-
-
WT-3622 Issues observed in OnBoard Module on LB
-
- Rejected
-
-
WT-7106 Form I-9 Employment HTML UI re-design
-
- Closed
-
-
- Time Spent:
- 5h
-
Analysis and coding for I9 EVerify
-
- Time Spent:
- 2.5h
-
Checking E-verify replies and XMLs for I-9 submit functionality.
-
- Time Spent:
- 8h
-
Checked Everify service issue
-
- Time Spent:
- 1.5h
-
Checking XML troubleshooting from e-verify reply
-
- Time Spent:
- 5h
-
Coding and verifying I9 verification details on web service
-
- Time Spent:
- 8h
-
SubmitInitalVerification() : Working on this case and Mapping data from model to web service object.
-
- Time Spent:
- 4h
-
Working on SupportingDocType and Model Values for SubmitInitialVerification
-
- Time Spent:
- 3h
-
Checked for UI and Validation
-
- Time Spent:
- 2h
-
Working for validation and UI for I-9
-
- Time Spent:
- 6h
-
UI revamp for I9 form Section I Section ii - List A Docs
-
- Time Spent:
- 7h
-
UI revamp for Section 2 A B C Lists
-
- Time Spent:
- 2.5h
-
Worked on I9-Form validations
-
- Time Spent:
- 3h
-
Client side validations for I-9 form fields
-
- Time Spent:
- 5.5h
-
I-9 Form validation and analysis and UI Discussion and Validation on I-9 form
-
- Time Spent:
- 3.5h
-
I-9 Form UI and USCIS validations - View and Model
-
- Time Spent:
- 1.5h
-
Worked on UI and Model Validation and States Dropdwon
-
- Time Spent:
- 1h
-
Communication with E-verify team.
-
- Time Spent:
- 5.5h
-
Issue Authority Validation and Fields at Model
-
- Time Spent:
- 2.5h
-
Excel-sheet issues analysed and checked
-
- Time Spent:
- 3h
-
R & D on docs given by E-verify team.
-
- Time Spent:
- 3h
-
Analysis of self test cases given by E-verify team.
-
- Time Spent:
- 7.5h
-
Analysis on I9 Documents and Technical Discussion with Swapnil.
Checking Document scenario to Submit I9 form
-
- Time Spent:
- 5h
-
Technical discussion with Niteen and R&D on Issuing authorities and ICA document by E-verify
-
- Time Spent:
- 4h
-
R&D and Analysis on I-9 E-verify web service and Documents
-
- Time Spent:
- 3h
-
Trying different cases for Initial Verification
-
- Time Spent:
- 2h
-
Worked on SubmitInitialVerification() and ContinueDuplicateCase() method for case 1
-
- Time Spent:
- 2h
-
Worked on SubmitDHSReverify() method for case 1
-
- Time Spent:
- 1.5h
-
Worked on SetDHSTnCNotifications method for case 1
-
- Time Spent:
- 1.5h
-
Worked on SubmitDHSReferrel method for case 1
-
- Time Spent:
- 1.5h
-
Worked on RetrieveLatter() method for case 1
-
- Time Spent:
- 3h
-
Checking Test cases for I-9 and Analyzing Documents List
-
- Time Spent:
- 3h
-
Coding for self test cases and saving to database , Discussion with Niteen.
-
- Time Spent:
- 6h
-
Document Drop-down Validation for Citizenship Code wise and Save and Update data of I-9 section at DB.
-
- Time Spent:
- 3h
-
Created E-verify case 4 scenario and checked through code.
-
- Time Spent:
- 1h
-
Worked with Swapnil for E-verify to Retrieve Letters from Everify.
-
- Time Spent:
- 2h
-
Implemented SSATnCNofication() method and made RetrieveLetters() method Modular
-
- Time Spent:
- 4h
-
Coding and analysis for Self test cases execution
-
- Time Spent:
- 1h
-
Analysis of Document types and issuing authorities in I-9
-
- Time Spent:
- 2h
-
CloseCase() Modular and Code refactoring for better reusability
-
- Time Spent:
- 3h
-
Discussion with Niteen for I-9 queries.
Analysis of Issuing authority for List B documents.
-
- Time Spent:
- 2h
-
Type changing and testing on I94Adminssion and USCIS Number
-
- Time Spent:
- 2h
-
Working on I-9 Data saving and Session management
-
- Time Spent:
- 2h
-
Scenario testing and Discussion with swapnil
-
- Time Spent:
- 2h
-
Preparing code for Self Test Case five
-
- Time Spent:
- 4h
-
Discussion with Niteen for I-9 queries,
Analysis,coding for Citizenship status and documents required as per ICA document by USCIS
-
- Time Spent:
- 3h
-
Working on I9 Data saving at Database
-
- Time Spent:
- 2h
-
Section 2 Document validation while fields are hidden
-
- Time Spent:
- 3h
-
Discussion with Swapnil and Case 5 initial Submission
-
- Time Spent:
- 4h
-
Get employment verification fields coding
-
- Time Spent:
- 2h
-
TnCNotification column adding in DB and Value Objects
-
- Time Spent:
- 2h
-
Working on case five to Submit case from WT UI
-
- Time Spent:
- 2h
-
Worked on Case five to make next step and Enabling sessions for case number and approval return statuses.
-
- Time Spent:
- 4h
-
Getresolvedcases code changes
-
- Time Spent:
- 3.25h
-
Implementation for Save Letter in DB and Uploading Letters into File Server
-
- Time Spent:
- 2h
-
Brought Case five to SSA Referral with DB opreations
-
- Time Spent:
- 2.25h
-
Saving Letter Code to DB and Implementation of SubmitSsaResubmittal()
-
- Time Spent:
- 1.25h
-
UI Design for reasoning part of I9 Form
-
- Time Spent:
- 5h
-
- Completed I9 Case Five
- Worked on Duplicate Reasons fro UI
- Implementation of Photo Matching case (Retrieve and Confirm photo)
-
- Time Spent:
- 4.25h
-
Completed Duplicate case through Workterra UI.
Photo Matching cose and Validation for that.
Resubmitting Case 5
-
- Time Spent:
- 3.5h
-
Analysis and working on Photo Matching view and other I9 form Validation
-
- Time Spent:
- 6h
-
- Photo Matching Implementation and Validations
- Case Five Completed
- Implementation (Model and Bussiness Logic) Changed for I-9 Approval Status
-
- Time Spent:
- 2h
-
Get resolved cases API changes
-
- Time Spent:
- 4h
-
- Removing unused sessions from Photo Verification page
- Adding MessageCode to I-9 Approval status View, model and vb.
- other I9 validations and code refacto
-
- Time Spent:
- 1h
-
Checking validations for LB (issuing Authority Error Message and Drop-down problem )
-
- Time Spent:
- 3.5h
-
Completed Case Five and requirement Analysis for it.
-
- Time Spent:
- 4h
-
Close Case View(Validation, UI), Model(Close case method) and Controller(Action) implemenation
-
- Time Spent:
- 3.5h
-
Close Case implimenation, validation and testing
-
- Time Spent:
- 3h
-
Close case and Eligibility Statement Implemenation of it
-
- Time Spent:
- 1.5h
-
Create E-verify status mapping sheet
-
- Time Spent:
- 1h
-
Analysis and discussion with Developers
-
- Time Spent:
- 4h
-
Check-in (Adding to stage) Project files and Localisation files and writing DDL, DML and Access Right scripts.
-
- Time Spent:
- 4h
-
Code review and checking password and submit e-verification changes
-
- Time Spent:
- 3h
-
DB Scripts creation and Check-in on Local and Stage.
I9 Changes checking-in on stage.
-
- Time Spent:
- 5h
-
Solving download issue for E-verify Letters.
Document validation for sec1 and sec2.
-
- Time Spent:
- 2h
-
Code check-in to stage branch and unit testing of build upload on stage.
-
- Time Spent:
- 4h
-
Document validations and JS Code Refactoring
-
- Time Spent:
- 8h
-
E-verify status analysis
-
- Time Spent:
- 3h
-
Production Certification with swapnil
-
- Time Spent:
- 2h
-
KT from Swapnil and Neetin on e-verify service status
Discussion with Hrishikesh and swapnil on stand alone
-
- Time Spent:
- 1h
-
KT to Mahendra and Rajendra
-
- Time Spent:
- 1.5h
-
KT to Rajendra and Mahendra
-
- Time Spent:
- 0.5h
-
Stand-up, Tech discussion with Rajendra and Mahendra
-
- Time Spent:
- 8h
-
Use case documentation reading
-
- Time Spent:
- 8h
-
Fixing issue of close case and Unit Testing by close another case.
Production Certification Case closed.
Production another cases completed with Swapnil
Fixing Photo Matching DB saving issue.
-
- Time Spent:
- 6h
-
Cod check-in to Stage.
solving Issues check list.
Checking Initial Submission issue
-
- Time Spent:
- 7h
-
Debugging Session issue occurring in Section 1.
List A, B, C and Additional document filtration.
Additional document validation.
Date validation changes
-
- Time Spent:
- 6h
-
List B Issuing Authority and Supporting doc save change.
List A, B, C and Additional doc validation change.
Date validate change
-
- Time Spent:
- 8h
-
COI and IssuingAuthority issue fixing.
List A, B, C and Add docs validation and DB save
Documents filtration, validation and code refactoring
-
- Time Spent:
- 4h
-
Validation Error Message change on Tab.
Looking for Issuing Authority & COI problem.
-
- Time Spent:
- 1.25h
-
internal discussion
unit testing
trunk and stage check-in
-
- Time Spent:
- 2h
-
Analysis, discussion and test case writing
-
- Time Spent:
- 2h
-
Fixing issuing authority issue
-
- Time Spent:
- 5h
-
Looking into case status update issue.
Tech discussion with mahendra.
Checklist
-
- Time Spent:
- 2h
-
I9 Tech discussion with Mahendra, Shubhangi and Swpanil
-
- Time Spent:
- 2.5h
-
Late Verification issue analysis fixand tested at local
-
- Time Spent:
- 8h
-
I9 verification check-ins for UI Refresh and LB Branch
Technical discussion with shubhangi, yogesh, rupesh, sushodhan and pratap.
-
- Time Spent:
- 3h
-
committing Localization changes to UiRefresh branch
internal discussion
-
- Time Spent:
- 2.5h
-
committing localization changes to LB
internal discussion
-
- Time Spent:
- 4h
-
Checking-in solving UIRefresh issue
-
- Time Spent:
- 2h
-
LB check-in and Checking issue for LB
-
- Time Spent:
- 1.5h
-
localization changes and internal discussion
-
- Time Spent:
- 8h
-
I9 Verification Production check-ins
-
- Time Spent:
- 3h
-
I-9 related localization changes check in from stage to production
internal discussion
-
- Time Spent:
- 2h
-
sanity testing for Tour functionality on Production
-
- Time Spent:
- 2h
-
Use case execution on stage
-
- Time Spent:
- 5.5h
-
E-verify use cases execution
-
- Time Spent:
- 2.5h
-
Analysis and Checking code changes for I9 Status change.
Updating GSM UI statuses for mahendra.
-
- Time Spent:
- 1h
-
Completing Yankee Doodle case on I9 service to check document no related issue
-
- Time Spent:
- 5h
-
Analysis and discussion of Task.
Implementing code for Send Email Notification.
Reject reason Views
-
- Time Spent:
- 6.5h
-
- Analysis and Implementation of expanding static letters limit to dynamic letter upload/download.
- Changes in Model, View, Controller, Value Object and Business Logic
- Unit Testing of Letter Download
- Checking letter download issue on production by changing File Structure.
-
- Time Spent:
- 0.75h
-
WSM GUI cases processed and Tech discussion with mahendra.
Short KT about E-verify service account handling.
-
- Time Spent:
- 2h
-
1.Onboard demo setup preparation and resolving bugs for demo
-
- Time Spent:
- 2.5h
-
E-verify demo preparation
-
- Time Spent:
- 1h
-
Helptext Popup for I9 form with Chhaya
-
- Time Spent:
- 1.25h
-
Boundary condition handled for letter downloading
-
- Time Spent:
- 0.5h
-
Code change and Local LB check-in for download letters
-
- Time Spent:
- 1.5h
-
Changing User Pwd and Update to Stage
I9 Works on UIRefresh
-
- Time Spent:
- 7.25h
-
2 Cases submitted to E-verify
Fixed Close Case popup issue
Tech discussion with Varsha
Issue solving for Employee Save
Unit Testing
-
- Time Spent:
- 2h
-
Checking e-verify scenarios on Azure
-
- Time Spent:
- 3h
-
Code Check-in on UIRefresh for Download letters and other I9 Changes
-
- Time Spent:
- 4h
-
Submitting cases to E-verify to check I-9 works or not
-
- Time Spent:
- 2.5h
-
Testing Stage E-verify service on Production
Completed Get Resolved case
Username and Password Update on production
-
- Time Spent:
- 4.5h
-
Check Live E-verify service on Local to mode on Production
Debugging and R&D